HOSTEL AND ACADEMIC BLOCKS AT CADET COLLEGE KARACHI
FOTCO FTTL TERMINAL TO PAPCO TERMINAL- FAUJI TRANS TERMINAL LTD CONSTRUCTION AND LAYING OF 20” HSD AND MOGAS PIPELINE
Laying of two pipelines one kilometer long, 20” diameter. Right of way preparation, trench excavation & backfilling, pipe sleepers and pipe support foundations pre-casting and installation, laying, testing and heat shrink sleeve installation of pipeline, pipeline tie-in welding and asphalt road repairing.